High speed fail: Bankrupt Illinois buying engines that don’t exist

Illinois Watchdog | Posted on

English: Map of Chicago Hub Network, a federal...

English: Map of Chicago Hub Network, a federally designated high speed rail corridor. (Photo credit: Wikipedia)

Illinois is looking for the railroad equivalent of a unicorn — a super-fast, super-clean, super-cheap locomotive that is not real.

The Federal Railroad Administration has placed Illinois in charge of buying 35 new, “next generation” locomotives to serve the to-be built high-speed rail lines in Illinois, Michigan, Missouri, California and Washington, even though the locomotives do not yet exist.

Share on Facebook
Share on Twitter
Share
Share
Follow

Get every new post delivered to your Inbox.

Join 10,719 other followers